Project Completion Certificate (Ground Water)
Scheme ID: 20101186 Name of Scheme: BHULAIDEEH GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 1680 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Oct-2024 Actual Date of Completion (Capex): 18-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe 150 mm dia 36 TW 25.959161 83.598151
2 Plain Pipe 200 mm dia 54 TW 25.959161 83.598151
3 Slotted pipe 150 mm dia 18 TW 25.959161 83.598151
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 350LPM/44M TW 25.959161 83.598151
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zincalume tank 100/14 OHT 25.959055 83.598099
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 80 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE 100 63 5.26
2 HDPE PN6 PE 100 75 1.68
3 HDPE PN6 PE 100 90 0.87
4 HDPE PN6 PE 100 110 0.59
5 HDPE PN6 PE 100 125 0.06
6 HDPE PN6 PE 100 140 1.03
7 HDPE PN6 PE 100 160 1.04
8 HDPE PN6 PE 100 180 0.10
9 HDPE PN6 PE 100 200 0.05
HSC Connection
Sno. Total Nos.
1 317
Other Details
1.67
0.00
1.77
19-Jan-2025
20-Jan-2025