| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101186 | Name of Scheme: BHULAIDEEH GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 5 |
| Total Population Covered: 1680 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Oct-2024 | Actual Date of Completion (Capex): 18-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe 150 mm dia | 36 | TW | 25.959161 | 83.598151 |
| 2 | Plain Pipe 200 mm dia | 54 | TW | 25.959161 | 83.598151 |
| 3 | Slotted pipe 150 mm dia | 18 | TW | 25.959161 | 83.598151 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 350LPM/44M | TW | 25.959161 | 83.598151 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zincalume tank | 100/14 | OHT | 25.959055 | 83.598099 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K7 | 80 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN6 PE 100 | 63 | 5.26 | |
| 2 | HDPE PN6 PE 100 | 75 | 1.68 | |
| 3 | HDPE PN6 PE 100 | 90 | 0.87 | |
| 4 | HDPE PN6 PE 100 | 110 | 0.59 | |
| 5 | HDPE PN6 PE 100 | 125 | 0.06 | |
| 6 | HDPE PN6 PE 100 | 140 | 1.03 | |
| 7 | HDPE PN6 PE 100 | 160 | 1.04 | |
| 8 | HDPE PN6 PE 100 | 180 | 0.10 | |
| 9 | HDPE PN6 PE 100 | 200 | 0.05 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 317 |