Project Completion Certificate (Ground Water)
Scheme ID: 20101502 Name of Scheme: BASUPUR BANKAT RURAL WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 5350 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2024 Actual Date of Completion (Capex): 18-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.02/193.8 Basupar Bankat 26.14447 83.32183
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 800/46 Basupar Bankat 26.14447 83.32183
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225/12 Basupar Bankat 26.14447 83.32183
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 150 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.009
2 HDPE Pipe PN-6: Class PE-100 75 0.061
HSC Connection
Sno. Total Nos.
1 556
Other Details
3.05
3.05
2.54
21-Oct-2024
22-Oct-2024