Project Completion Certificate (Ground Water)
Scheme ID: 20101522 Name of Scheme: KABIRUDDINPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4811 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-May-2023 Actual Date of Completion (Capex): 15-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29.98/88.97 Kabiruddinpur 26.2926067 82.9857967
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 700/46 Kabiruddinpur 26.2926067 82.9857967
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/12 Kabiruddinpur 26.2926067 82.9857967
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI 125 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 12.402
2 HDPE Pipe PN-6: Class PE-100 75 0.198
3 HDPE Pipe PN-6: Class PE-100 90 1.195
4 HDPE Pipe PN-6: Class PE-100 140 2.987
HSC Connection
Sno. Total Nos.
1 470
Other Details
2.99
2.99
2.96
23-Oct-2024
24-Oct-2024