Project Completion Certificate (Ground Water)
Scheme ID: 20101547 Name of Scheme: MUNGERPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1918 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 19-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube -well 36 / 137.09 Mungerpur 29.591123 78.227346
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 450 / 60 Mungerpur 29.591123 78.227346
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 / 16 Mungerpur 29.591123 78.227346
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.3985
2 HDPE 75 2.0132
3 HDPE 90 1.5823
4 HDPE 110 0.2875
5 HDPE 140 3.825
HSC Connection
Sno. Total Nos.
1 120
Other Details
2.53
0.00
2.54
19-Aug-2025
20-Aug-2025