Project Completion Certificate (Ground Water)
Scheme ID: 20101554 Name of Scheme: Bakashpur Rural Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3959 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Aug-2023 Actual Date of Completion (Capex): 11-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.11/116.83 BAKSHPUR 26.0573 82.93969
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 550/45 BAKSHPUR 26.0573 82.93969
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175/12 BAKSHPUR 26.0573 82.93969
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 200 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.693
2 HDPE Pipe PN-6: Class PE-100 75 0.582
3 HDPE Pipe PN-6: Class PE-100 90 0.518
4 HDPE Pipe PN-6: Class PE-100 110 0.525
5 HDPE Pipe PN-6: Class PE-100 180 0.056
6 HDPE Pipe PN-6: Class PE-100 200 0.280
HSC Connection
Sno. Total Nos.
Other Details
2.20
2.20
2.42
11-Apr-2024
12-Apr-2024