Project Completion Certificate (Ground Water)
Scheme ID: 20101579 Name of Scheme: BIBIPUR WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 2946 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Aug-2023 Actual Date of Completion (Capex): 05-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.5/82.33 Bibipur 26.13732 83.08937
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400/49 Bibipur 26.13732 83.08937
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/16 Bibipur 26.13732 83.08937
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 200 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.025
2 HDPE Pipe PN-6: Class PE-100 75 0.149
3 HDPE Pipe PN-6: Class PE-100 140 0.289
HSC Connection
Sno. Total Nos.
1 447
Other Details
2.90
2.90
2.83
09-Apr-2024
10-Apr-2024