Project Completion Certificate (Ground Water)
Scheme ID: 20101580 Name of Scheme: AKMA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3688 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Aug-2023 Actual Date of Completion (Capex): 20-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 17/120.96 Ekma 26.08253 83.09475
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 450/45 Ekma 26.08253 83.09475
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150/12 Ekma 26.08253 83.09475
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 200 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 75 0.460
2 HDPE Pipe PN-6: Class PE-100 90 11.342
HSC Connection
Sno. Total Nos.
1 267
Other Details
2.28
2.28
2.23
23-Oct-2024
24-Oct-2024