Project Completion Certificate (Ground Water)
Scheme ID: 20101583 Name of Scheme: DASU PATTI WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 7
Total Population Covered: 3274 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-May-2023 Actual Date of Completion (Capex): 14-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05/110.07 Dasupatti 26.07495 83.09455
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400/45 Dasupatti 26.07495 83.09455
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/12 Dasupatti 26.07495 83.09455
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 200 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 10.616
2 HDPE Pipe PN-6: Class PE-100 75 0.067
3 HDPE Pipe PN-6: Class PE-100 90 0.828
4 HDPE Pipe PN-6: Class PE-100 110 0.398
5 HDPE Pipe PN-6: Class PE-100 125 0.234
HSC Connection
Sno. Total Nos.
1 285
Other Details
2.06
2.06
2.11
31-Jan-2024
01-Feb-2024