| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101840 | Name of Scheme: DUBIYANA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 1871 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-Jun-2023 | Actual Date of Completion (Capex): 09-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 20 M/314.51 M | Dubiyana | 26.673589 | 80.142204 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 395 LPM/55 M | Dubiyana | 26.673589 | 80.142204 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | No OHT | Dubiyana | 26.673589 | 80.142204 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K-7 | 100 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/PN-6 | 63 | 3.995 | |
| 2 | HDPE/PN-6 | 75 | 0.413 | |
| 3 | HDPE/PN-6 | 90 | 0.957 | |
| 4 | HDPE/PN-6 | 110 | 0.302 | |
| 5 | HDPE/PN-6 | 140 | 0.016 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |