Project Completion Certificate (Ground Water)
Scheme ID: 20101850 Name of Scheme: SENIYA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1482 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Jun-2023 Actual Date of Completion (Capex): 09-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 8 M/57.53 M Seniya 26.329429 80.328548
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 305 LPM/50 M Seniya 26.329429 80.328548
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 No OHT Seniya 26.329429 80.328548
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K-7 100 0.009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6 63 2.738
2 HDPE/PN-6 75 0.134
3 HDPE/PN-6 90 0.339
4 HDPE/PN-6 110 0.856
5 HDPE/PN-6 140 0.058
6 HDPE/PN-6 160 2.127
HSC Connection
Sno. Total Nos.
1 306
Other Details
1.31
0.00
0.00
05-Nov-2024
06-Nov-2024