Project Completion Certificate (Ground Water)
Scheme ID: 20101892 Name of Scheme: Bhurepur PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2652 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 16-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.73 m/ 131.47 m Bhurepur 26.638909 79.448798
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 550 lpm/ 51 m Bhurepur 26.638909 79.448798
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 kl/ 14m Bhurepur 26.638909 79.448798
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.235
2 HDPE 90 2.100
3 HDPE 140 0.347
HSC Connection
Sno. Total Nos.
1 283
Other Details
2.34
0.00
0.00
15-Aug-2023
17-Aug-2023