Project Completion Certificate (Ground Water)
Scheme ID: 20101905 Name of Scheme: BIRBHANWALA WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1346 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 06-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 22.51 / 167.06 Birbhanwala 29.534554 78.645665
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 280 / 52 Birbhanwala 29.534554 78.645665
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 / 14 Birbhanwala 29.534554 78.645665
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.043
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 22.764
2 HDPE 75 0.897
3 HDPE 90 1.148
4 HDPE 110 0.804
5 HDPE 125 0.136
HSC Connection
Sno. Total Nos.
1 206
Other Details
2.13
0.00
2.17
06-Apr-2026
07-Apr-2026