Scheme ID: 20101943 Name of Scheme: SINGTHEE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 1290 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Jul-2024 Actual Date of Completion (Capex): 16-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17 MTR / 80.30 MTR SINGTHEE 28.909112 77.901689
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM / 50 MTR SINGTHEE 28.909112 77.901689
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 14 MTR SINGTHEE 28.909112 77.901689
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.227
2 HDPE 90 0.519
3 HDPE 110 1.037
4 HDPE 140 0.663
HSC Connection
Sno. Total Nos.
1 214
Other Details
1.79
0.00
1.78
16-Sep-2024
17-Dec-2024