Project Completion Certificate (Ground Water)
Scheme ID: 20101945 Name of Scheme: JETHU MAWAI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1248 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Jul-2024 Actual Date of Completion (Capex): 06-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.17 m / 81.73 m JETHU MAWAI 29.171125 77.848715
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150 LPM / 52 m JETHU MAWAI 29.171125 77.848715
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 14 m JETHU MAWAI 29.171125 77.848715
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.854
2 HDPE 90 0.891
3 HDPE 110 0.244
4 HDPE 140 0.353
HSC Connection
Sno. Total Nos.
1 223
Other Details
1.73
0.00
1.72
06-Feb-2025
07-May-2025