Project Completion Certificate (Ground Water)
Scheme ID: 20101948 Name of Scheme: LAUKAPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1395 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 04-Jul-2024 Actual Date of Completion (Capex): 29-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 73.2 MTR / 15.14 MTR LAUKAPUR 28.909112 77.901689
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM / 52 MTR LAUKAPUR 28.909112 77.901689
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50KL / 12 MTR LAUKAPUR 28.909112 77.901689
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.660
2 HDPE 90 0.622
3 HDPE 110 0.180
4 HDPE 140 0.419
HSC Connection
Sno. Total Nos.
1 157
Other Details
1.38
0.00
1.42
29-Sep-2024
30-Dec-2024