Scheme ID: 20101976 Name of Scheme: SARRIYA KANNO WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 13
Total Population Covered: 6714 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-May-2023 Actual Date of Completion (Capex): 05-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.02 / 93.98 SARRIYA KANNO 26.090474 81.829598
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550 LPM / 54 M SARRIYA KANNO 26.090474 81.829598
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 16 M SARRIYA KANNO 26.090474 81.829598
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.933
2 HDPE 90 1.445
3 HDPE 110 1.401
4 HDPE 140 1.739
5 HDPE 160 0.406
HSC Connection
Sno. Total Nos.
1 506
Other Details
3.00
0.00
2.94
05-Sep-2024