| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101984 | Name of Scheme: LALUPUR DHABIYA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2274 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Dec-2024 | Actual Date of Completion (Capex): 31-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM PLAIN PIPE | 18.30 | LALUPUR DHABIYA | 26.354892 | 81.666139 |
| 2 | 200 MM PLAIN PIPE | 51.00 | LALUPUR DHABIYA | 26.354892 | 81.666139 |
| 3 | 150 MM SLOTTED PIPE | 6.00 | LALUPUR DHABIYA | 26.354892 | 81.666139 |
| 4 | 200 MM SLOTTED PIPE | 18.00 | LALUPUR DHABIYA | 26.354892 | 81.666139 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 200 LPM / 50 M | LALUPUR DHABIYA | 26.354892 | 81.666139 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 50KL/12M | LALUPUR DHABIYA | 26.354892 | 81.666139 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.019 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 3.317 | |
| 2 | HDPE PIPE | 63 | 11.207 | |
| 3 | HDPE PIPE | 110 | 1.011 | |
| 4 | HDPE PIPE | 140 | 1.019 | |
| 5 | HDPE PIPE | 160 | 0.310 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 263 |