Project Completion Certificate (Ground Water)
Scheme ID: 20101984 Name of Scheme: LALUPUR DHABIYA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2274 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Dec-2024 Actual Date of Completion (Capex): 31-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM PLAIN PIPE 18.30 LALUPUR DHABIYA 26.354892 81.666139
2 200 MM PLAIN PIPE 51.00 LALUPUR DHABIYA 26.354892 81.666139
3 150 MM SLOTTED PIPE 6.00 LALUPUR DHABIYA 26.354892 81.666139
4 200 MM SLOTTED PIPE 18.00 LALUPUR DHABIYA 26.354892 81.666139
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 200 LPM / 50 M LALUPUR DHABIYA 26.354892 81.666139
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50KL/12M LALUPUR DHABIYA 26.354892 81.666139
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 3.317
2 HDPE PIPE 63 11.207
3 HDPE PIPE 110 1.011
4 HDPE PIPE 140 1.019
5 HDPE PIPE 160 0.310
HSC Connection
Sno. Total Nos.
1 263
Other Details
2.04
0.00
2.04
03-Sep-2024
15-Dec-2024