| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101987 | Name of Scheme: PAIGA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 1248 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Nov-2025 | Actual Date of Completion (Capex): 25-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200 MM Plain Pipe | 58 | PAINGA | 26.21743 | 81.62063 |
| 2 | 200 MM Strainer Pipe | 8 | PAINGA | 26.21743 | 81.62063 |
| 3 | 150 MM Plain Pipe | 17.3 | PAINGA | 26.21743 | 81.62063 |
| 4 | 150 MM Strainer Pipe | 3 | PAINGA | 26.21743 | 81.62063 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 525 | PAINGA | 26.21743 | 81.62063 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 | PAINGA | 26.21743 | 81.62063 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Rising Main | 100 | .02211 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | .153 | |
| 2 | HDPE | 75 | 0.5973 | |
| 3 | HDPE | 63 | 8.6951 | |
| 4 | HDPE | 110 | 1.7804 | |
| 5 | HDPE | 140 | 0.125 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 245 |