| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101990 | Name of Scheme: LALPUR WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 1628 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Dec-2024 | Actual Date of Completion (Capex): 27-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200MM PLAIN PIPE | 51 | LALPUR 81.569906 | 26.370698 | 81.569906 |
| 2 | 150MM PLAIN PIPE | 24.80 | LALPUR | 26.370698 | 81.569906 |
| 3 | 150MM SLOTTED PIPE | 12 | LALPUR | 26.370698 | 81.569906 |
| 4 | 200MM SLOTTED PIPE | 15 | LALPUR | 26.370698 | 81.569906 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 350LPM / 50Mtr | LALPUR | 26.370698 | 81.569906 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 100KL / 12MTR | LALPUR | 26.370698 | 81.569906 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | .023 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 7.247 | |
| 2 | HDPE PIPE | 63 | 5.94 | |
| 3 | HDPE PIPE | 110 | 1.689 | |
| 4 | HDPE PIPE | 125 | 0.435 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 254 |