| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101996 | Name of Scheme: NADIWAN WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 13 |
| Total Population Covered: 3024 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Jun-2025 | Actual Date of Completion (Capex): 07-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 27.3 | NADIWAN | 26.325184 | 81.74862 |
| 2 | 150MM SLOTTED PIPE | 11 | NADIWAN | 26.325184 | 81.74862 |
| 3 | 300MM PLAIN PIPE | 57 | NADIWAN | 26.325184 | 81.74862 |
| 4 | 300MM SLOTTED PIPE | 11 | NADIWAN | 26.325184 | 81.74862 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 650LPM / 56MTR | NADIWAN | 26.325184 | 81.74862 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 650KL / 18MTR | NADIWAN | 26.325184 | 81.74862 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | .038 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 8.831 | |
| 2 | HDPE PIPE | 63 | 13.415 | |
| 3 | HDPE PIPE | 110 | .469 | |
| 4 | HDPE PIPE | 125 | .598 | |
| 5 | HDPE PIPE | 140 | .726 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 534 |