Project Completion Certificate (Ground Water)
Scheme ID: 20101996 Name of Scheme: NADIWAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 13
Total Population Covered: 3024 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Jun-2025 Actual Date of Completion (Capex): 07-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 27.3 NADIWAN 26.325184 81.74862
2 150MM SLOTTED PIPE 11 NADIWAN 26.325184 81.74862
3 300MM PLAIN PIPE 57 NADIWAN 26.325184 81.74862
4 300MM SLOTTED PIPE 11 NADIWAN 26.325184 81.74862
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 650LPM / 56MTR NADIWAN 26.325184 81.74862
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 650KL / 18MTR NADIWAN 26.325184 81.74862
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .038
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 8.831
2 HDPE PIPE 63 13.415
3 HDPE PIPE 110 .469
4 HDPE PIPE 125 .598
5 HDPE PIPE 140 .726
HSC Connection
Sno. Total Nos.
1 534
Other Details
4.06
0.00
3.95
13-Dec-2024
15-Mar-2025