| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102035 | Name of Scheme: DHARMGADPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1250 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 04-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 270 LPM | 12 / 104.35 | DHARMGADPUR | 25.760151 | 81.016025 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 7.5 HP Submersible pump | 270 LPM / 55 | DHARMGADPUR | 25.760151 | 81.016025 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 100 / 12 | DHARMGADPUR | 25.760153 | 81.015941 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.013 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 PE-100 | 140 | 0.08260 | |
| 2 | HDPE PIPE PN-6 PE-100 | 125 | 0.438 | |
| 3 | HDPE PIPE PN-6 PE-100 | 110 | 0.47420 | |
| 4 | HDPE PIPE PN-6 PE-100 | 90 | 0.8886 | |
| 5 | HDPE PIPE PN-6 PE-100 | 75 | 0.988 | |
| 6 | HDPE PIPE PN-6 PE-100 | 63 | 1.8272 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 309 |