Project Completion Certificate (Ground Water)
Scheme ID: 20102039 Name of Scheme: SARWAL No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1726 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Sep-2023 Actual Date of Completion (Capex): 03-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 17 M / 92.52 M Sarwal 25.717617 80.802709
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 350 LPM / 60 M Sarwal 25.717617 80.802709
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ELEVATED SERVICE RESERVIOR 100 KL / 14 M Sarwal 25.775138 80.977535
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 0.0291
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 PE100 140 0.19
2 HDPE PN-6 PE100 125 0.088
3 HDPE PN-6 PE100 110 0.4292
4 HDPE PN-6 PE100 90 0.5313
5 HDPE PN-6 PE100 75 0.6493
6 HDPE PN-6 PE100 63 2.18
HSC Connection
Sno. Total Nos.
1 411
Other Details
2.22
1.88
1.88
24-May-2025
25-May-2025