| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102039 | Name of Scheme: SARWAL | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1726 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 21-Sep-2023 | Actual Date of Completion (Capex): 03-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 17 M / 92.52 M | Sarwal | 25.717617 | 80.802709 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 350 LPM / 60 M | Sarwal | 25.717617 | 80.802709 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ELEVATED SERVICE RESERVIOR | 100 KL / 14 M | Sarwal | 25.775138 | 80.977535 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 100 | 0.0291 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE100 | 140 | 0.19 | |
| 2 | HDPE PN-6 PE100 | 125 | 0.088 | |
| 3 | HDPE PN-6 PE100 | 110 | 0.4292 | |
| 4 | HDPE PN-6 PE100 | 90 | 0.5313 | |
| 5 | HDPE PN-6 PE100 | 75 | 0.6493 | |
| 6 | HDPE PN-6 PE100 | 63 | 2.18 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 411 |