| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102042 | Name of Scheme: PARI NARWA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1920 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Jan-2024 | Actual Date of Completion (Capex): 23-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 400 LPM | 18 M /125.37 M | Pari Narwa | 25.768606 | 87.026295 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 400 LPM / 55 | Pari Narwa | 25.768606 | 87.026295 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 125 KL / 12 M | Pari Narwa | 25.768606 | 87.026295 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 200 | 0.022 | |
| 2 | HDPE Pipe | 180 | 0.958 | |
| 3 | HDPE Pipe | 140 | 0.461 | |
| 4 | HDPE Pipe | 125 | 0.443 | |
| 5 | HDPE Pipe | 110 | 0.536 | |
| 6 | HDPE Pipe | 90 | 1.274 | |
| 7 | HDPE Pipe | 75 | 1.148 | |
| 8 | HDPE Pipe | 63 | 0.969 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 372 |