Project Completion Certificate (Ground Water)
Scheme ID: 20102042 Name of Scheme: PARI NARWA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1920 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Jan-2024 Actual Date of Completion (Capex): 23-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 400 LPM 18 M /125.37 M Pari Narwa 25.768606 87.026295
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 400 LPM / 55 Pari Narwa 25.768606 87.026295
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 125 KL / 12 M Pari Narwa 25.768606 87.026295
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 200 0.022
2 HDPE Pipe 180 0.958
3 HDPE Pipe 140 0.461
4 HDPE Pipe 125 0.443
5 HDPE Pipe 110 0.536
6 HDPE Pipe 90 1.274
7 HDPE Pipe 75 1.148
8 HDPE Pipe 63 0.969
HSC Connection
Sno. Total Nos.
1 372
Other Details
1.93
0.00
1.93
19-Aug-2025
20-Aug-2025