| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102043 | Name of Scheme: MANJHANPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2390 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 25-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 500 LPM" | 20 M / 84.24 M | Manjhanpur | 25.605965 | 81.157989 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP Submersible Pump | 500 LPM / 55 M | Manjhanpur | 25.605965 | 81.157989 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 150 KL / 12 M | Manjhanpur | 25.605922 | 81.15831 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 100 | 19.10 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE 100 | 200 | 0.079 | |
| 2 | HDPE PN-6 PE 100 | 180 | 0.189 | |
| 3 | HDPE PN-6 PE 100 | 160 | 0.4362 | |
| 4 | HDPE PN-6 PE 100 | 140 | 0.421 | |
| 5 | HDPE PN-6 PE 100 | 125 | 0.5585 | |
| 6 | HDPE PN-6 PE 100 | 110 | 0.6962 | |
| 7 | HDPE PN-6 PE 100 | 90 | 1.5606 | |
| 8 | HDPE PN-6 PE 100 | 75 | 0.8265 | |
| 9 | HDPE PN-6 PE 100 | 63 | 1.7246 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 478 |