Project Completion Certificate (Ground Water)
Scheme ID: 20102044 Name of Scheme: SHAHPUR HARDASPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1830 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 20-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Deep Tube well 400 LPM 15 / 85.37 SHAHPUR HARDASPUR 25.570578 81.186444
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible pump 400 LPM / 55 SHAHPUR HARDASPUR 25.570578 81.186444
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 125 / 12 SHAHPUR HARDASPUR 25.570582 81.186558
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.0248
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 PE-100 140 0.4659
2 HDPE Pipe PN-6 PE-100 125 0.265
3 HDPE Pipe PN-6 PE-100 110 0.640
4 HDPE Pipe PN-6 PE-100 90 0.623
5 HDPE Pipe PN-6 PE-100 75 0.5638
6 HDPE Pipe PN-6 PE-100 63 1.5256
HSC Connection
Sno. Total Nos.
1 339
Other Details
1.86
1.86
1.86
02-Sep-2024
03-Sep-2024