Project Completion Certificate (Ground Water)
Scheme ID: 20102049 Name of Scheme: BARAICHI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1950 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 19-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 450 LPM" 22 M / 112.2 M Baraichi 25.706022 81.037045
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 450 LPM / 55 M Baraichi 25.706022 81.037045
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 125 KL / 12 M Baraichi 25.705868 81.037055
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 0.02046
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6, PE-100 140 0.1774
2 HDPE PN-6, PE-100 125 0.1861
3 HDPE PN-6, PE-100 110 0.5379
4 HDPE PN-6, PE-100 90 0.582
5 HDPE PN-6, PE-100 75 0.9703
6 HDPE PN-6, PE-100 63 2.0977
HSC Connection
Sno. Total Nos.
1 381
Other Details
1.91
1.91
1.91
18-Mar-2025
19-Mar-2025