Project Completion Certificate (Ground Water)
Scheme ID: 20102064 Name of Scheme: MURADGAM PUR PURSI VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 9763 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-May-2023 Actual Date of Completion (Capex): 01-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30m/63m Muradgram Pursi 28.740986 77.513388
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1350/53 Muradgram Pursi 28.740986 77.513388
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400/14 Muradgram Pursi 28.740986 77.513388
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 200 .010
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.624
2 HDPE 75 .463
3 HDPE 90 .439
4 HDPE 110 .841
5 HDPE 125 .699
6 HDPE 140 .402
7 HDPE 160 .553
8 HDPE 180 .093
9 HDPE 200 .105
HSC Connection
Sno. Total Nos.
1 1165
Other Details
3.02
3.14
3.14
30-Apr-2025
01-May-2025