Project Completion Certificate (Ground Water)
Scheme ID: 20102069 Name of Scheme: MISBAPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 714 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-May-2023 Actual Date of Completion (Capex): 01-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 79/20 miswapur 28.8027 77.4619
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 100/49 miswapur 28.8027 77.4619
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50/10 miswapur 28.8027 77.4619
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 80 .016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.122
2 HDPE 90 .295
HSC Connection
Sno. Total Nos.
1 173
Other Details
0.98
0.93
0.93
27-Mar-2025
01-Apr-2025