Project Completion Certificate (Ground Water)
Scheme ID: 20102138 Name of Scheme: Allipur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 810 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Oct-2024 Actual Date of Completion (Capex): 20-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain pipe 150mm dia 9 TW 26.037467 83.578228
2 Plain pipe 200mm dia 54 TW 26.037467 83.578228
3 Slotted pipe 150mm dia 15 TW 26.037467 83.578228
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 70LPM/42M TW 26.037467 83.578228
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 N/A N/A N/A N/A N/A
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 80 0.03
2 HDPE PN6 PE 100 140 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE 100 63 1.65
2 HDPE PN6 PE 100 75 0.18
3 HDPE PN6 PE 100 90 0.03
4 HDPE PN6 PE 100 110 0.21
5 HDPE PN6 PE 100 125 0.08
HSC Connection
Sno. Total Nos.
1 154
Other Details
0.63
0.00
0.70
20-Jan-2025
20-Jan-2025