Project Completion Certificate (Ground Water)
Scheme ID: 20102309 Name of Scheme: AMANATPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1831 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 09-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 SUBMERSIBLE 30.08/114.41 AMANATPUR 29.222461 78.553179
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 390/46 AMANATPUR 29.222461 78.553179
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 AMANATPUR 29.222461 78.553179
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 100 0.045
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.7693
2 HDPE 75 0.6514
3 HDPE 90 0.5666
4 HDPE 110 0.2127
5 HDPE 140 0.23204
HSC Connection
Sno. Total Nos.
1 398
Other Details
1.72
0.00
1.78
09-Jan-2025
10-Jan-2025