| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102316 | Name of Scheme: MOTADHAK WSS | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1955 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 10-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.16 / 236.10 | Motadhak , Kodiya | 29.749782 , 29.7303432 | 78.446699, 78.5052391 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Tube Well | 450 / 50 | Motadhak , Kodiya | 29.749782 , 29.7303432 | 78.446699, 78.5052391 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125 / 12 | Motadhak | 29.749782 | 78.446699 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 18.549 | |
| 2 | HDPE | 75 | 3.113 | |
| 3 | HDPE | 90 | 1.859 | |
| 4 | HDPE | 110 | 1.964 | |
| 5 | HDPE | 140 | 0.401 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 549 |