Project Completion Certificate (Ground Water)
Scheme ID: 20102316 Name of Scheme: MOTADHAK WSS No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1955 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24.16 / 236.10 Motadhak , Kodiya 29.749782 , 29.7303432 78.446699, 78.5052391
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Tube Well 450 / 50 Motadhak , Kodiya 29.749782 , 29.7303432 78.446699, 78.5052391
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 / 12 Motadhak 29.749782 78.446699
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 18.549
2 HDPE 75 3.113
3 HDPE 90 1.859
4 HDPE 110 1.964
5 HDPE 140 0.401
HSC Connection
Sno. Total Nos.
1 549
Other Details
2.48
0.00
2.55
10-Jun-2025
11-Jun-2025