Project Completion Certificate (Ground Water)
Scheme ID: 20102445 Name of Scheme: MANPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3650 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 16-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 SUBMERSIBLE 36.06/119.45 MANPUR 29.163212 78.311328
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 830/8 MANPUR 29.163212 78.304178
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/12 MANPUR 29.163212 78.304178
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 100 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.7923
2 HDPE 75 0.63
3 HDPE 90 0.5308
4 HDPE 110 0.3442
5 HDPE 125 0.448
6 HDPE 140 0.489
7 HDPE 160 0.292
8 HDPE 180 0.2408
9 HDPE 200 0.0899
HSC Connection
Sno. Total Nos.
1 484
Other Details
2.75
0.00
2.74
15-Feb-2025
16-Feb-2025