Project Completion Certificate (Ground Water)
Scheme ID: 20106665 Name of Scheme: MIRAPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 1297 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Jun-2024 Actual Date of Completion (Capex): 24-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.02/77.83 MIRAPUR 26.491302 81.655192
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150lpm/ 52 M MIRAPUR 26.491302 81.655192
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 14 M MIRAPUR 26.491302 81.655192
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.797
2 HDPE 90 0.664
3 HDPE 110 0.468
4 HDPE 140 0.035
HSC Connection
Sno. Total Nos.
1 230
Other Details
1.79
0.00
1.76
24-Sep-2024
25-Dec-2024