Project Completion Certificate (Ground Water)
Scheme ID: 20111027 Name of Scheme: Paman No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2405 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Oct-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.831 As per Site
2 HDPE 75 1.075 As per Site
3 HDPE 90 0.446 As per Site
4 HDPE 110 0.008 As per Site
5 HDPE 140 2.365 As per Site
6 HDPE 160 0.045 As per Site
HSC Connection
Sno. Total Nos.
Other Details
2.09
2.20
2.20
31-Aug-2024
01-Sep-2024