Project Completion Certificate (Ground Water)
Scheme ID: 20114442 Name of Scheme: Kharkhoda W/S Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 474 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 06-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12.02/81.75 Kharkhonda 28.598652 78.236373
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 110/26 Kharkhonda 28.598652 78.236373
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 110 0.3246
2 PN-6 PE100/HDPE 63 1.305
HSC Connection
Sno. Total Nos.
1 110
Other Details
0.70
0.63
0.00
20-Nov-2024
21-Nov-2024