Project Completion Certificate (Ground Water)
Scheme ID: 20130184 Name of Scheme: Jungle tinkonia No 3 water supply scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2740 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Jun-2024 Actual Date of Completion (Capex): 25-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/161.18 Jungle tinkonia No 3 26.777023 83.44449
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 36/39 Jungle tinkonia No 3 26.777023 83.44449
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 Jungle tinkonia No 3 26.7768 83.4443
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.263
2 HDPE 75 0.194
3 HDPE 63 7.016
HSC Connection
Sno. Total Nos.
1 410
Other Details
1.86
0.00
1.76
24-Feb-2024
22-Nov-2024