Project Completion Certificate (Ground Water)
Scheme ID: 7620547 Name of Scheme: Gajpatipur Pws No. of Villages: 1 No. of Habitation Covered: 22
Total Population Covered: 6290 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2025 Actual Date of Completion (Capex): 14-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Existing Tubewell GAJPATIPUR 27.531195 81.567495
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 72/40 GAJPATIPUR 27.531195 81.567495
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/18 GAJPATIPUR 27.53107 81.56728
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Rising Main/DI-K7 200 0.03 Existing Rising Main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 4.707
2 HDPE Pipe PN-6; Class PE-100 75 0.142
3 HDPE Pipe PN-6; Class PE-100 90 0.663
4 HDPE Pipe PN-6; Class PE-100 110 0.408
5 HDPE Pipe PN-6; Class PE-100 140 0.114
6 HDPE Pipe PN-6; Class PE-100 200 1.036
HSC Connection
Sno. Total Nos.
1 595
Other Details
1.31
1.29
1.29
19-May-2024
15-Jun-2025