| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 7620547 | Name of Scheme: Gajpatipur Pws | No. of Villages: 1 | No. of Habitation Covered: 22 |
| Total Population Covered: 6290 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Jun-2025 | Actual Date of Completion (Capex): 14-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | Existing Tubewell | GAJPATIPUR | 27.531195 | 81.567495 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 72/40 | GAJPATIPUR | 27.531195 | 81.567495 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300/18 | GAJPATIPUR | 27.53107 | 81.56728 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Rising Main/DI-K7 | 200 | 0.03 | Existing Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6; Class PE-100 | 63 | 4.707 | |
| 2 | HDPE Pipe PN-6; Class PE-100 | 75 | 0.142 | |
| 3 | HDPE Pipe PN-6; Class PE-100 | 90 | 0.663 | |
| 4 | HDPE Pipe PN-6; Class PE-100 | 110 | 0.408 | |
| 5 | HDPE Pipe PN-6; Class PE-100 | 140 | 0.114 | |
| 6 | HDPE Pipe PN-6; Class PE-100 | 200 | 1.036 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 595 |