| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359217 | Name of Scheme: AHMADPUR DEWARIYA TUBEWELL | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2010 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2037 |
| Date of Completion (As per Contract): 26-Aug-2022 | Actual Date of Completion (Capex): 10-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200X150 MM TUBE WELL | 18.11 M / 113.27 M | AHMADPUR DEVARIYA | 27.261411° | 79.578058° |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 400 LPM / 51 M | AHMADPUR DEVARIYA | 27.261411° | 79.578058° |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 M STAGING | AHMADPUR DEVARIYA | 27.261411° | 79.578058° |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.941 | |
| 2 | HDPE | 75 | 0.22 | |
| 3 | HDPE | 90 | 0.558 | |
| 4 | HDPE | 110 | 0.657 | |
| 5 | HDPE | 140 | 0.075 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 354 |