Project Completion Certificate (Ground Water)
Scheme ID: 8359385 Name of Scheme: Ikorapur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2870 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 15-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 15.03 mtr/123.72mtr IKORAPUR 26.499345* 79.558923*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 51(M^3)/44 mtr IKORAPUR 26.499345* 79.558923*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200KL/16 mtr IKORAPUR 26.499724* 79.559013*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 38.60
2 DI 100 7.30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5442
2 HDPE 75 605
3 HDPE 90 47
4 HDPE 110 363
5 HDPE 140 54
6 HDPE 160 145.40
HSC Connection
Sno. Total Nos.
1 490
Other Details
2.68
1.99
1.99
28-Oct-2023
29-Oct-2023