| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359563 | Name of Scheme: HARBANSHPUR | No. of Villages: 1 | No. of Habitation Covered: 12 |
| Total Population Covered: 2460 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 09-Feb-2023 | Actual Date of Completion (Capex): 01-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MS Pipe Slotted | 21 | HARBANSHPUR | 26.899473 | 82.179402 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10 HP | 420 | HARBANSHPUR | 26.899473 | 82.179402 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT- 125KL 12m | OHT- 125KL 12m | HARBANSHPUR | 26.899473 | 82.179402 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | 100mm dia K-7 | 100 | 0.021 | |
| 2 | 150mm dia K-7 | 150 | 0.01 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.34 | |
| 2 | HDPE | 75 | 0.828 | |
| 3 | HDPE | 63 | 13.552 | |
| 4 | HDPE | 160 | 0.05 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 350 |