Project Completion Certificate (Ground Water)
Scheme ID: 8359688 Name of Scheme: HANSU PURA HARKISHANPUR VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 7489 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Aug-2023 Actual Date of Completion (Capex): 19-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.21 MTR / 127.84 MTR HANSUPURA HARIKISHANPUR 29.13256 74.436827
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 12.5 HP 650 LPM / 40 MTR HANSUPURA HARIKISHANPUR 29.13256 74.436827
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 14 MTR HANSUPURA HARIKISHANPUR 29.132663 78.43694
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 200 0.151
2 HDPE PIPE PN-6 CLASS PE-100 140 0.213
3 HDPE PIPE PN-6 CLASS PE-100 125 0.187
4 HDPE PIPE PN-6 CLASS PE-100 110 0.360
5 HDPE PIPE PN-6 CLASS PE-100 90 0.708
6 HDPE PIPE PN-6 CLASS PE-100 75 1.049
7 HDPE PIPE PN-6 CLASS PE-100 63 6.313
HSC Connection
Sno. Total Nos.
1 848
Other Details
2.32
2.32
2.32
07-Jun-2024
08-Jun-2024