Project Completion Certificate (Ground Water)
Scheme ID: 8359725 Name of Scheme: ARIYASO VILLAGE RURAL WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2301 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Aug-2023 Actual Date of Completion (Capex): 10-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Strainer (m) 18 TW 26.089832 83.560267
2 Plain Pipe (m) 63.12 TW 26.089832 83.560267
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 500/45 Ph 26.089834 83.560264
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Tank 100/12 OHT 26.089835 83.560266
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 8.81
2 HDPE PN6 PE100 75 0.213
3 HDPE PN6 PE100 90 0.341
4 HDPE PN6 PE100 110 0.176
5 HDPE PN6 PE100 140 0.056
HSC Connection
Sno. Total Nos.
1 284
Other Details
2.31
2.04
0.00
09-Dec-2024
10-Dec-2024