| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359749 | Name of Scheme: AHLADPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2470 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 28-Feb-2023 | Actual Date of Completion (Capex): 24-May-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | VT Pump | 30/91.08 | Ahladpur | 28.410181 | 79.492349 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 30.30/45 | Ahladpur | 28.410181 | 79.492349 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank | 150/16 | Ahladpur | 28.410181 | 79.492349 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | 0.018 | OK |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.262 | ok |
| 2 | HDPE | 75 | 0.495 | ok |
| 3 | HDPE | 90 | 0.155 | ok |
| 4 | HDPE | 110 | 0.213 | ok |
| 5 | HDPE | 140 | 0.0363 | ok |
| 6 | HDPE | 180 | 0.205 | ok |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 266 |