Project Completion Certificate (Ground Water)
Scheme ID: 8359758 Name of Scheme: Barauli Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-May-2023 Actual Date of Completion (Capex): 23-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.04/120.16 Barauli 26.83986 83.46529
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33/40 Barauli 26.83986 83.46529
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Barauli 26.83984 83.46522
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 0.177
2 HDPE 140 0.190
3 HDPE 110 0.486
4 HDPE 90 0.486
5 HDPE 75 2.246
6 HDPE 63 5.752
HSC Connection
Sno. Total Nos.
1 452
Other Details
1.86
0.00
2.09
22-Aug-2024
11-Dec-2024