Scheme ID: 8359759 Name of Scheme: Jangal Ayodhya Prasad Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 16
Total Population Covered: 6000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-May-2023 Actual Date of Completion (Capex): 21-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.25/126.47 Jangal Ayodhya Prasad 26.868931 83.405446
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 81/41 Jangal Ayodhya Prasad 26.868931 83.405446
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 350KL/16 M Jangal Ayodhya Prasad 26.868996 83.405337
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.007 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.881 Completed
2 HDPE 75 7.299 Completed
3 HDPE 90 1.919 Completed
4 HDPE 110 1.099 Completed
5 HDPE 140 0.629 Completed
6 HDPE 160 0.375 Completed
7 HDPE 200 0.750 Completed
HSC Connection
Sno. Total Nos.
1 1027
Other Details
3.66
0.00
3.49
20-Oct-2024
06-May-2025