| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359759 | Name of Scheme: Jangal Ayodhya Prasad Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 16 |
| Total Population Covered: 6000 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 11-May-2023 | Actual Date of Completion (Capex): 21-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 27.25/126.47 | Jangal Ayodhya Prasad | 26.868931 | 83.405446 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 81/41 | Jangal Ayodhya Prasad | 26.868931 | 83.405446 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank-1 | 350KL/16 M | Jangal Ayodhya Prasad | 26.868996 | 83.405337 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.007 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.881 | Completed |
| 2 | HDPE | 75 | 7.299 | Completed |
| 3 | HDPE | 90 | 1.919 | Completed |
| 4 | HDPE | 110 | 1.099 | Completed |
| 5 | HDPE | 140 | 0.629 | Completed |
| 6 | HDPE | 160 | 0.375 | Completed |
| 7 | HDPE | 200 | 0.750 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1027 |