Project Completion Certificate (Ground Water)
Scheme ID: 8359762 Name of Scheme: PANGI KALAN No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4847 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 01-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 145.84 Pangi Kalan 27.901722 80.826722
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 25HP/42M Pangi Kalan 27.901722 80.826722
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350KL/12M Pangi Kalan 27.901722 80.826722
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I Material 150 0.0172
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 140 1.926
2 HDPE Pipe PN-6: Class PE-100 90 1.965
3 HDPE Pipe PN-6: Class PE-100 63 5.6189
4 HDPE Pipe PN-6: Class PE-100 75 0.087
HSC Connection
Sno. Total Nos.
1 810
Other Details
28035500.00
28019421.47
28019421.47
02-Nov-2023
21-Mar-2025