| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8359771 | Name of Scheme: POHALI | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 6287 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 25-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 37.41 Mtr / 101.09 Mtr | POHALI | 29.067122 | 77.632602 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1250 LPM / 54 Mtr | POHALI | 29.067122 | 77.632602 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 Kl / 16 M | POHALI | 29.067122 | 77.632602 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | 0.0235 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.640 | |
| 2 | HDPE | 75 | 0.688 | |
| 3 | HDPE | 90 | 0.221 | |
| 4 | HDPE | 110 | 0.114 | |
| 5 | HDPE | 140 | 0.214 | |
| 6 | HDPE | 160 | 0.155 | |
| 7 | HDPE | 200 | 1.012 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1087 |