Project Completion Certificate (Ground Water)
Scheme ID: 8359777 Name of Scheme: BAHRAWANI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1814 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Feb-2023 Actual Date of Completion (Capex): 12-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mm X 150mm 30/151.33 BAHRAWANI 25.341785 83.314017
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 22.06/55 BAHRAWANI 25.341785 83.314017
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 150/12 BAHRAWANI 25.341958 83.314041
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 80 18
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.505
2 HDPE 75 0.270
3 HDPE 90 0.242
4 HDPE 140 0.854
HSC Connection
Sno. Total Nos.
1 300
Other Details
1.87
0.00
1.87
30-Mar-2025
30-Jun-2025