Project Completion Certificate (Ground Water)
Scheme ID: 8360393 Name of Scheme: AMHERA VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 6017 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Nov-2025 Actual Date of Completion (Capex): 01-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 10.51
2 HDPE PIPE PN -6: CLASS PE -100 75 0.46
3 HDPE PIPE PN -6: CLASS PE -100 90 0.30
4 HDPE PIPE PN -6: CLASS PE -100 110 0.06
5 HDPE PIPE PN -6: CLASS PE -100 125 0.11
6 HDPE PIPE PN -6: CLASS PE -100 140 0.23
7 HDPE PIPE PN -6: CLASS PE -100 160 0.22
8 HDPE PIPE PN -6: CLASS PE -100 180 0.07
9 HDPE PIPE PN -6: CLASS PE -100 200 0.12
HSC Connection
Sno. Total Nos.
Other Details
1.41
1.41
3.27
31-Mar-2026
01-Apr-2026