Project Completion Certificate (Ground Water)
Scheme ID: 8360394 Name of Scheme: BUNDRA KALAN VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 11-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.75/131.28 Bundrakalan 29.189195 78.416968
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submerssible Pump 10 HP 450 LPM/44 Mtr Bundrakalan 29.189195 78.416968
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Bundrakalan 29.189195 78.416968
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN 6 : Class PE 100 63 5.60
2 HDPE Pipe PN 6 : Class PE 100 75 0.6
3 HDPE Pipe PN 6 : Class PE 100 90 0.04
4 HDPE Pipe PN 6 : Class PE 100 110 0.06
5 HDPE Pipe PN 6 : Class PE 100 125 0.08
6 HDPE Pipe PN 6 : Class PE 100 160 0.04
HSC Connection
Sno. Total Nos.
Other Details
1.51
1.84
1.68
21-Oct-2024
22-Oct-2024